Huijue Group has announced that it participated in compiling T/CABEE 106—2025, Technical Standard for Smart Building Microgrids. The China Association of Building Energy Efficiency issued the group standard on 19 May 2025, with an implementation date of 1 July 2025.
A system-level view of distributed energy
The standard addresses smart microgrid projects in new, renovated and expanded civil buildings as well as industrial and commercial parks. The official company summary describes a framework covering architecture, distributed energy resources, building loads, energy storage, protection, monitoring, control and intelligent management platforms.
That system-level scope matters because a microgrid is not a collection of independent products. The electrical topology, protection strategy, operating modes, control hierarchy and communications interfaces have to work together. A change in storage capacity or power-conversion equipment can affect protection settings, control behavior, thermal loading and the data required by the management platform.
Why communications infrastructure is part of the design
Smart microgrids depend on reliable measurement and control. Switchgear, meters, controllers, storage systems and supervisory platforms must exchange data with predictable interfaces and suitable network protection. Physical infrastructure—racks, cabinets, cable routing and environmental control—also influences maintainability. Buyers can review our data-center and network infrastructure products alongside site-energy equipment when building an integrated equipment room or edge site.
Applying a standard to a real project
A standard provides a common technical framework, but the project designer remains responsible for selecting the clauses, national requirements and local grid rules that apply to a specific installation. The system voltage, energy sources, operating modes, critical loads and connection point should be documented before equipment selection begins.
Huijue Group’s participation reflects its experience with storage, monitoring and integrated energy projects. It does not mean that every product automatically satisfies every clause. Project-specific conformity evidence should be reviewed during technical clarification.
——END——
