Communications and energy cabinet assembly line in a manufacturing workshop

News Center

Technical Notes for Network Projects

The knowledge center is expanding from passive optical components to the wider physical network layer, including cabling, ODN, data-center organization, telecom power, power distribution and protected outdoor equipment.

800G Fiber Link Loss Budget: DR8 MPO Trunk and Connector Selection
2026-10-27

800G Fiber Link Loss Budget: DR8 MPO Trunk and Connector Selection

Huijue Group Concludes Phase One of the 140th Canton Fair
2026-10-21

Huijue Group Concludes Phase One of the 140th Canton Fair

Fiber Connector Inspection and Cleaning Workflow for Repeatable Measurements
2026-10-15

Fiber Connector Inspection and Cleaning Workflow for Repeatable Measurements

ETC Gantry Cabinet and Equipment Shelter Selection for Highway Sites
2026-10-14

ETC Gantry Cabinet and Equipment Shelter Selection for Highway Sites

Telecom Site Energy FAT and SAT Checklist: Power, Battery, Controls and Handover
2026-10-12

Telecom Site Energy FAT and SAT Checklist: Power, Battery, Controls and Handover

Telecom Site EMS Points List: Power, Battery, Cooling and Environmental Alarms
2026-10-08

Telecom Site EMS Points List: Power, Battery, Cooling and Environmental Alarms

Aesthetic Antenna Radomes for Urban Sites: What to Confirm Before Selection
2026-10-03

Aesthetic Antenna Radomes for Urban Sites: What to Confirm Before Selection

-48 V DC Earthing and Return Architectures for Telecom Sites
2026-09-30

-48 V DC Earthing and Return Architectures for Telecom Sites

Rack Shelves, Guide Rails and Grounding Busbars: Compatibility Checklist
2026-09-27

Rack Shelves, Guide Rails and Grounding Busbars: Compatibility Checklist

Huijue Group Opens 140th Canton Fair Meetings for Communications and Site-Energy Projects
2026-09-24

Huijue Group Opens 140th Canton Fair Meetings for Communications and Site-Energy Projects

N+1 Rectifier Redundancy and Backup Runtime: What to Specify Before Quotation
2026-09-22

N+1 Rectifier Redundancy and Backup Runtime: What to Specify Before Quotation

Integrated Telecom Power Cabinet vs Separate Equipment and Battery Cabinets
2026-09-20

Integrated Telecom Power Cabinet vs Separate Equipment and Battery Cabinets

ODN Port Naming and Change Control for QR, RFID and Automated-ID Workflows
2026-09-16

ODN Port Naming and Change Control for QR, RFID and Automated-ID Workflows

MPO/MTP Trunk Cable Polarity and Fiber Count: A Procurement Checklist
2026-09-11

MPO/MTP Trunk Cable Polarity and Fiber Count: A Procurement Checklist

Outdoor Battery Cabinet Thermal Management: Cells, BMS, Compartments and Service Access
2026-09-08

Outdoor Battery Cabinet Thermal Management: Cells, BMS, Compartments and Service Access

Fusion Splice Protection Sleeves: Fibre Count, Heater and Tray Compatibility
2026-09-05

Fusion Splice Protection Sleeves: Fibre Count, Heater and Tray Compatibility

Central-Office ODF Capacity Planning: Termination, Patch Fields and Cable Entry
2026-08-31

Central-Office ODF Capacity Planning: Termination, Patch Fields and Cable Entry

Coastal Telecom Cabinet Specification: Salt Mist, Fasteners, Coating and Maintenance
2026-08-29

Coastal Telecom Cabinet Specification: Salt Mist, Fasteners, Coating and Maintenance

Pre-Terminated vs Field-Terminated Drop Cable for FTTH Rollouts
2026-08-24

Pre-Terminated vs Field-Terminated Drop Cable for FTTH Rollouts

FTTA Cable Selection Checklist for BBU-to-RRU, RRH and AAU Links
2026-08-19

FTTA Cable Selection Checklist for BBU-to-RRU, RRH and AAU Links

Custom Telecom Cabinet FAT Checklist: Drawings, Wiring, Cooling and Enclosure Evidence
2026-08-16

Custom Telecom Cabinet FAT Checklist: Drawings, Wiring, Cooling and Enclosure Evidence

Wind-Solar Hybrid Outdoor Energy Cabinet: When a Wind Input Is Justified
2026-08-13

Wind-Solar Hybrid Outdoor Energy Cabinet: When a Wind Input Is Justified

FTTH and ODN Acceptance Testing Workflow Before Service Activation
2026-08-08

FTTH and ODN Acceptance Testing Workflow Before Service Activation

30–50 kWh Telecom Battery Cabinet vs Modular Backup Battery
2026-08-02

30–50 kWh Telecom Battery Cabinet vs Modular Backup Battery