Integrated BBU Cabinet with Cooling

Integrated BBU Cabinet with Cooling

An integrated BBU cabinet combining centralized equipment space, directed cooling, site power and monitoring for access-room and convergence-room installation projects.

Product Features

  • Cabinet height options of 2000 or 2200 mm, width 600 mm and depth options of 1000 or 1200 mm.
  • 42U or 46U cabinet formats and a documented 2–3 cabinet combination.
  • Front supply and rear return airflow with rack-mounted cooling.
  • Source cooling reference of 3.5 kW at L35/L35 and 220 V AC, 50 Hz supply.
  • Power-system reference of 300 A using six 50 A rectifier modules, with -48 V DC output.
  • Local 10-inch touch screen and remote web access in the monitoring description.

The Integrated BBU Cabinet with Cooling groups baseband equipment and its supporting infrastructure into a prefabricated cabinet arrangement. It addresses access and convergence rooms where multiple BBUs need coordinated power, airflow and maintenance access within a limited floor area.

Its enclosure and cooling are designed as a combined system. The source describes internal circulation, hot/cold separation and emergency ventilation; the final configuration must be matched to the BBU population and the room’s heat-rejection provisions.

Selection & Configuration

Start with the BBU equipment count, dimensions, airflow direction and measured or specified heat load. The source lists a 6 kW maximum load per cabinet and a separate 10 kW IT-load support figure for the combined configuration; confirm the configuration boundary rather than adding these figures together. Review rectifier loading, battery autonomy, cooling duty and emergency ventilation as one schedule.

Manufacturing & Customization

Huijue Group can evaluate OEM labeling and a BBU cabinet layout developed from project drawings or equipment samples. Ducts, power sections and controls require engineering agreement on feasibility, tooling, tests, quantity and delivery scope.

Information for an Accurate Quotation

Send BBU models, cabinet quantity, rack elevation, DC loads, AC input, battery runtime target, cooling design conditions, alarms and required smoke, water, door or video sensors.

Technical Parameters

J-net IM-RACK01 Configuration Form
Cabinet systemCooling System
Dimensions (H x W x D MM)2000(2200)X 600X 1000(1200)Rated AC Transmission Input power220V AC 50Hz
System Layout / ConfigurationCabinet-level micro-modulesCooling capacity (L35/L35)3.5KW
Number of machines that can be merged2-3 unitsRated input power Rate1270W
Capacity42U(46U)Rated current8A
Protection RatingIP30Heating Capacity1000W
Operating Temperature-20℃~45℃RefrigerantR410A
InstallationConcrete floor, raised floorSensible Heat Ratio (SHR)≥0.99
Maximum load per cabinet6KWEnergy Efficiency Ratio≥3.2
Supports maximum power consumption of IT load10KWAir distributionFront air supply, rear air return
IT cabinet bearing requirementsStatic load 1500kg, dynamic load 1000kgInstallationRack mounting
• Distribution SystemMonitoring system
Lightning protection levelClass C, In 20ka, Imax40kaMonitoring systemSupport remote web interface access
Power InputSingle and dual channels optionalLocal InterfaceStandard 10-inch touch screen
Dual Power Switching SystemOptional for 2-way inputMobile O&MMobile App, SMS Alerts
Power System Capacity300ASmoke detectorOptional
Rectifier module50A*6Water Leak DetectionOptional
Input Voltage380V 3-phaseTemperature and humidityOptional
Output voltage-48V DCDoor LockOptional
Output power factor0.9Video monitoringOptional
Backup time15~30minFire Suppression System
Lithium batteryStandardRack-Mount Fire Suppression UnitIntegrated Temperature Detection and Fire Suppression Unit

Applications

Intended for centralized BBU installations in access rooms, convergence rooms and other indoor telecom equipment locations.

Installation Notes

IP30 and -20°C to 45°C operation are listed. Concrete-floor and raised-floor installation are described; verify floor support, room airflow and cooling service connections.

Buyer Questions

Frequently Asked Questions

Answers specific to Integrated BBU Cabinet with Cooling selection, configuration and purchasing.

Is a specific energy-saving percentage established?

The design uses directed airflow and coordinated cooling. Site energy use depends on equipment load, ambient conditions and controls; no project saving percentage should be assumed.

Can the system be planned as several cabinets?

A 2–3 cabinet arrangement is documented. Confirm the equipment distribution, shared infrastructure and expansion boundary in the final design.

Are all monitoring sensors standard?

Several sensors and access functions are identified as optional. Request an itemized monitoring and alarm schedule for the proposed cabinet package.

Does the published battery backup time determine my autonomy?

The source has a 15–30 minute reference. Required autonomy must be calculated from the actual DC load, battery configuration and operating conditions.

Related Products

Application planning

Where this product family fits

Use the deployment context to narrow the configuration before comparing dimensions, capacities and options.

Equipment rooms

Organize racks, pathways and service access around active network equipment.

Data centers

Coordinate cabinet capacity, cable routes, airflow and planned expansion.

Edge facilities

Package network equipment within compact distributed infrastructure sites.

Retrofit projects

Add capacity while accounting for existing racks, routes and maintenance space.

Before quotation: confirm capacity, interfaces, installation environment, power conditions, quantity and required options.