HR1000 Rack-Based Micro Data Center

HR1000 Rack-Based Micro Data Center

A cabinet-level micro data-center solution integrating rack space, UPS, distribution, cooling and monitoring for small IT installations and documented multi-cabinet arrangements.

Product Features

The cabinet reference is 2000 or 2200 mm high, 600 mm wide and 1350 mm deep, with 42U or 46U format. The single-cabinet cooling reference is 3.5 kW at L35/L35, using 220 V AC, 50 Hz supply. The source describes rack-mounted cooling, hot/cold airflow separation and local touch-screen operation.

  • 6 kVA or 10 kVA UPS options in the single-cabinet schedule.
  • Rack-mounted lithium batteries or battery-cabinet arrangements.
  • Remote web access and optional smoke, water, temperature, door and video monitoring.
  • Optional cabinet-level fire extinguishing equipment.

The HR1000 Rack-Based Micro Data Center brings the infrastructure for a small IT installation into a cabinet-based assembly. Rack space, power distribution, UPS, cooling and monitoring are coordinated around the equipment rather than treated as independent room systems.

The source includes a single-cabinet configuration and a separate two- to three-cabinet arrangement. These configurations have different combined cooling and load references, so the desired system boundary must be established before quoting.

Selection & Configuration

Specify usable IT space after infrastructure is installed, device heat loads and supply requirements. Select battery runtime from the actual load rather than assuming the 15–30 minute source reference applies to every order. For a two- or three-cabinet system, confirm shared equipment, the stated 10 kW combined IT-load reference and how redundancy is implemented.

Manufacturing & Customization

For HR1000 deployments, Huijue Group can review private-label identification, OEM assembly drawings and sample-based mechanical interfaces. Engineering review must establish the feasible configuration, tooling, system tests, quantity and delivery scope.

Information for an Accurate Quotation

Include the single- or multi-cabinet preference, equipment schedule, IT load, autonomy, feed arrangement, required alarms, room dimensions and cooling service requirements.

Technical Parameters

Single cabinet configuration table
Cabinet system
Dimensions (H x W x D MM)2000(2200)X 600X 1350
Capacity42U(46U)
Protection RatingIP30
Operating Temperature-20℃~45℃
InstallationConcrete floor, raised floor
Maximum load per cabinet6KW
IT cabinet bearing requirementsStatic load 1500kg, dynamic load 1000kg
Cooling System
Rated AC input power supply220V AC 50Hz
Cooling capacity (L35/L35)3.5KW
Rated Input Power1270W
Rated current8A
Heating Capacity1000W
RefrigerantR410A
Sensible Heat Ratio (SHR)≥0.99
Energy Efficiency Ratio≥3.2
Air distributionFront air supply, rear air return
InstallationRack mounting
• Distribution System
Lightning protection levelClass C, In 20ka, Imax40ka
Power InputSingle and dual channels optional
Dual Power Switching SystemOptional for 2-way input
UPS Capacity6KVA / 10KVA
UPS ArchitectureN、N+1、2N
Input Voltage220V Single Phase 380V Three Phase
Output voltage220V~240V AC 50Hz 380V~400V AC 50Hz
Output power factor0.9
Battery ConfigurationRack-mounted lithium batteries, lithium battery cabinets
Backup time15~30min
Maintenance BypassStandard
Monitoring system
Monitoring systemSupport remote web interface access
Local InterfaceStandard 10-inch touch screen
Mobile O&MMobile App, SMS Alerts
Smoke detectorOptional
Water Leak DetectionOptional
Temperature and humidityOptional
Door LockOptional
Video monitoringOptional
Multi-cabinet configuration table
Cabinet systemCooling System
Dimensions (H x W x D MM)2000(2200)X 600X 1350Rated AC input power supply220V AC 50Hz
System Layout / ConfigurationMultiple cabinetsCooling capacity (L35/L35)3.5KW*2
Number of single cabinets2-3 unitsRated Input Power1270W*2
Capacity42U (46U) * number of cabinetsRated current8A
Protection RatingIP30Heating Capacity1000W*2
Operating Temperature-20℃~45℃RefrigerantR410A
InstallationConcrete floor, raised floorSensible Heat Ratio (SHR)≥0.99
Maximum load per cabinet6KWEnergy Efficiency Ratio≥3.2
Supports maximum power consumption of IT load10KWAir distributionFront air supply, rear air return
IT cabinet bearing requirementsStatic load 1500kg, dynamic load 1000kgInstallationRack mounting
• Distribution SystemMonitoring system
Lightning protection levelClass C, In 20ka, Imax40kaMonitoring systemSupport remote web interface access
Power InputSingle and dual channels optionalLocal InterfaceStandard 10-inch touch screen
Dual Power Switching SystemOptional for 2-way inputMobile O&MMobile App, SMS Alerts
UPS Capacity10KVASmoke detectorOptional
UPS ArchitectureN、N+1、2NWater Leak DetectionOptional
Input Voltage220V Single Phase 380V Three PhaseTemperature and humidityOptional

Applications

Applicable to small IT rooms, cabinet-based edge installations and compact projects requiring coordinated power and cooling.

Installation Notes

IP30 and -20°C to 45°C operation are listed, with concrete-floor or raised-floor installation. Confirm service space, room heat rejection and electrical connection conditions.

Buyer Questions

Frequently Asked Questions

Answers specific to HR1000 Rack-Based Micro Data Center selection, configuration and purchasing.

Is all of the nominal 42U or 46U available for IT equipment?

Infrastructure may occupy part of the enclosure. Request a rack elevation showing the usable equipment space in the selected configuration.

Are environmental sensors included automatically?

Several sensor types are optional in the source. Agree an itemized sensor and alarm list, together with local and remote monitoring requirements.

Can HR1000 use more than one cabinet?

A two- to three-cabinet arrangement is documented. Its power, cooling and shared infrastructure must be selected from that arrangement rather than extrapolated from one cabinet.

Is a fixed installation time or PUE promised?

No project installation duration or PUE is established here. Both depend on site readiness, actual load, cooling conditions and the agreed scope.

Related Products

Application planning

Where this product family fits

Use the deployment context to narrow the configuration before comparing dimensions, capacities and options.

Equipment rooms

Organize racks, pathways and service access around active network equipment.

Data centers

Coordinate cabinet capacity, cable routes, airflow and planned expansion.

Edge facilities

Package network equipment within compact distributed infrastructure sites.

Retrofit projects

Add capacity while accounting for existing racks, routes and maintenance space.

Before quotation: confirm capacity, interfaces, installation environment, power conditions, quantity and required options.