Core equipment rooms
Coordinate DC power, distribution, batteries and monitoring around communications loads.
Outdoor HJ-CHO hybrid power cabinets spanning compact 6 kW pole sites to 36 kW floor-standing stations with matched storage and renewable-input options.
The Outdoor Hybrid Telecom Energy Cabinet coordinates rectifier, MPPT and storage functions for outdoor communications loads. Its four configurations cover very different site scales: 6 kW with 5 kWh, 12 kW with 20 kWh, 24 kW with 40 kWh and 36 kW with 80 kWh.
HJ-CHO-06005-W is the compact pole-mounted version, measuring 700 × 580 × 450 mm. The larger cabinets stand on the floor; the 36 kW HJ-CHO-36080-W measures 2200 × 1500 × 850 mm. Foundation, access and transport planning therefore change significantly across the range.
Choose from peak power, daily energy and required backup time. Check battery-only current and usable storage independently of the cabinet maximum power. Off-grid planning requires seasonal generation and recovery calculations, while a grid-assisted installation also needs a defined response to utility loss and restoration.
Huijue Group can review outdoor hybrid configurations for OEM or private-label supply, including sample-based and drawing-based work. Mounting, thermal packages, input modules and feeder layouts require engineering confirmation of feasibility, tooling, validation tests, order quantity and the final supply scope.
Provide load profile, backup hours, grid/off-grid mode, PV/wind resource, AC and DC outputs, battery duty, mounting arrangement, thermal requirements and monitoring interface.
| Model | HJ-CHO-06005-W | HJ-CHO-12020-W | HJ-CHO-24040-W | HJ-CHO-36080-W |
|---|---|---|---|---|
| Maximum power | 6 kW | 12 kW | 24 kW | 36 kW |
| Battery capacity | 5 kWh | 20 kWh | 40 kWh | 80 kWh |
| Dimensions | 700 × 580 × 450 mm | 1600 × 750 × 750 mm | 2200 × 800 × 850 mm | 2200 × 1500 × 850 mm |
| Installation | Outdoor pole-mount | Outdoor floor-standing | Outdoor floor-standing | Outdoor floor-standing |
| Thermal control | Fan-cooled | Fan / air conditioner optional | Fan / air conditioner optional | Fan / air conditioner optional |
| Battery rated voltage | 48 V (40–60 V) | 48 V (40–60 V) | 48 V (40–60 V) | 48 V (40–60 V) |
| Peak efficiency | 96% | 96% | 96% | 96% |
State temperature extremes, humidity, corrosive exposure and direct sunlight. Confirm enclosure protection and cooling against the actual build, along with pole strength or floor-foundation capacity.
Buyer Questions
Answers specific to Outdoor Hybrid Telecom Energy Cabinet selection, configuration and purchasing.
HJ-CHO-06005-W is the documented 6 kW/5 kWh pole model. The 12, 24 and 36 kW models are floor-standing.
Peak watts establish only part of the requirement. Daily consumption, backup current, storage autonomy, renewable input and recovery time also determine the appropriate configuration.
Off-grid configurations are described, but viability depends on the measured load, seasonal renewable resource and battery sizing. The energy design must be confirmed for each site.
Use the deployment context to narrow the configuration before comparing dimensions, capacities and options.
Coordinate DC power, distribution, batteries and monitoring around communications loads.
Use integrated or wall-mounted systems where equipment space is limited.
Match generation, storage and power conversion to load and autonomy requirements.
Combine grid, solar, battery or generator inputs around a defined operating strategy.
Before quotation: confirm capacity, interfaces, installation environment, power conditions, quantity and required options.