Telecom base stations
House communications, power and battery equipment in a serviceable outdoor enclosure.
A 40U outdoor rack enclosure with insulated walls, configurable cooling and integrated power options, offering source-listed IP55 protection with an IP65 variant requiring explicit selection.
The 40U Outdoor Floor-Standing Integrated Cabinet provides a tall 19-inch rack enclosure for outdoor communications equipment and selected power-support systems. It suits layouts requiring more vertical equipment space while retaining a 750 × 750 mm listed cabinet width and depth.
The source gives dimensions of 2050 × 750 × 750 mm, with a 150 mm base notation. Obtain the final external and rack drawing to confirm base datum, rail depth and the route for installing long or heavy equipment.
Reserve space for power conversion, distribution and monitoring before filling the rack. Select ingress protection with the actual cooling and cable-entry arrangement. Check total equipment mass, center of gravity and anchoring against the site support design; the listed 50 kg shelf rating does not define the enclosure load.
Huijue Group can review OEM 40U cabinets, private labels and sample- or drawing-led integration changes. Protection upgrades, tooling, thermal/electrical tests, quantities and delivery scope must be confirmed for the selected configuration.
Send the 40U equipment plan, total load and mass, IP requirement, cooling calculation, power/battery scope and foundation details.
| Product Model | HJ-OFVD40-01 | HJ-OFAD40-01 | HJ-OFVD40-02 | HJ-OFAD40-02 |
|---|---|---|---|---|
| Rack Capacity | 40U, 19″ rails | |||
| Thermal Control | AC220V fan type (4 units/set on top) | AC220V 1500W air-conditioner type, with emergency fan | AC220V fan type (4 units/set on top) | AC220V 1500W air-conditioner type, with emergency fan |
| Dimensions (H×W×D mm) | 2050-750-750(150mm base) | 2050-750-750(150mm base) | 2050-750-750(150mm base) | 2050-750-750(150mm base) |
| Main Configuration | Double-layer 20 mm EPS structure, front and rear doors | Double-layer 20 mm EPS structure, front door | ||
| Lighting | AC220V, 5 W LED lamp, with door switch | |||
| Shelf | 1.2 mm cold-rolled steel sheet, load capacity 50 kg | |||
| L-shaped Bracket | 1.5 mm cold-rolled steel sheet | |||
| Base | 2.0 mm thick | |||
| Lock | Anti-theft design, outdoor waterproof type, zinc alloy, three-point locking | |||
| Power Distribution Unit | AC circuit breakers: input 32A/2P×1, output 10A/1P×3, SPD 40 kA×1 | |||
| AC-DC Power Supply | Switching power supply, 150 A rectifier | |||
| UPS | 1~6KVA | |||
| Battery System | LiFePO4 battery 100AH, DC48V | |||
| Monitoring Unit | 1. Supports smoke, door contact, water leak, infrared and other sensors; environmental data viewable via connected platform; standard 1U rack mount; 2. Software for viewing collected data and alarms | |||
| Ingress Protection | Default IP55, optional IP65 | |||
| Packaging | Carton + wooden pallet |
Specify rainfall, dust, solar load, ambient temperature and corrosion exposure. Confirm the ordered protection rating for the complete fitted cabinet.
Buyer Questions
Answers specific to 40U Outdoor Floor-Standing Integrated Cabinet selection, configuration and purchasing.
The source lists IP55 as default and IP65 as optional. State the required rating and confirm it for the complete configured cabinet.
A conversion needs review of mounting openings, supply, heat load, controls and enclosure sealing. It is not an assumed direct replacement.
These are source-listed support options. The agreed equipment schedule must identify their inclusion, capacities and rack allocation.
Confirm lifting provisions and the permitted handling state for the specific equipped assembly before moving it.
Use the deployment context to narrow the configuration before comparing dimensions, capacities and options.
House communications, power and battery equipment in a serviceable outdoor enclosure.
Protect distributed equipment while maintaining cable entry and service access.
Coordinate cabinet capacity, thermal management and equipment zoning.
Fit protected infrastructure into space-constrained or visually sensitive locations.
Before quotation: confirm capacity, interfaces, installation environment, power conditions, quantity and required options.